Construction Commenced of Phase 1 Purification Facility for Lithium-ion Battery Material in Bécancour and the Land for Phase 2 Expansion is now Successfully Acquired
Construction Commenced of Phase 1 Purification Facility for Lithium-ion Battery Material in Bécancour and the Land for Phase 2 Expansion is now Successfully Acquired
– Nouveau Monde is making significant progress on the advancement of its previously announced Phase 1 purification operation at Olin Corporation’s facility in Bécancour, Québec – Olin’s move-in ready space has proven advantageous in accelerating preparation and construction times – Key major equipment has arrived from Italy and will be installed shortly – Commissioning and first production of Nouveau Monde’s high-purity spheronised and flake graphite for use in lithium-ion batteries is scheduled to commence mid-2021 – Successful completion of the strategic acquisition of the 200,000-m(2) land for the Phase 2 expansion (commercial stage) in the Bécancour industrial park – This important milestone further cements Nouveau Monde’s vertical integration model, allowing the Company to benefit from full exposure to the entire « mine-to-market » battery materials value chain – Besides lithium-ion batteries, Nouveau Monde’s high-purity graphite products will target high-growth markets such as fuel cells, and 5G heat dissipation foils
MONTRÉAL, Jan. 21, 2021 (GLOBE NEWSWIRE) – Nouveau Monde Graphite inc. (« Nouveau Monde » or the « Company ») (TSXV: NOU; OTCQX: NMGRF; Frankfurt: NM9) is pleased to provide an update on the buildout of the Phase 1 operation at its move-in ready space located in Bécancour, Québec (referred to as « BEC1 »). The Company is targeting mid-2021 for the commencement of production of the first tonnes of high-purity spherical graphite destined for the high-growth EV and renewable energy sectors. Once fully ramped up, the nameplate capacity of Phase 1 will be 1,500 tonnes per annum of purified material produced using the first two state-of-the-art commercial-scale modules. The Company intends to use this initial production to advance its qualification process with major battery makers with the objective to secure long-term supply agreements.
Eric Desaulniers, President and CEO of Nouveau Monde: « The commercialisation of our thermochemical purification process is a very important milestone for the Company. To date, we have been able to ship a limited number of kilograms to potential clients, however our Phase 1 operation will allow us to send our customers tonnes of our advanced material. We’re excited but remain clear-headed and focused on the end goal of becoming a tier-1 supplier of anode material for lithium-ion batteries. »
Arne H. Frandsen, Chairman of Nouveau Monde continued : « I am delighted with the progress and achievements to date. The strategic purchase of the adjacent land for our Phase 2 expansion, is likewise of great importance. It will now allow Nouveau Monde to grow the production within the Bécancour industrial park, allowing for a safe and cost-efficient expansion of our anode material production ».
Key advancements at Phase 1
– Since the beginning of January 2021 this year, Nouveau Monde has been present at Olin’s facility on a daily basis and is pleased with the pace of advancement of the Phase 1 work. – The transformer-rectifier ordered from Friem in Italy in December 2019 successfully completed a full year of extensive testing. It has been shipped from Italy on January 3, 2021 and arrived at the Port of Montreal on January 17. It is scheduled to be delivered onsite in Bécancour on January 22. All preparatory work related to its installation is expected to be be completed by the end of February. – Upgrades to the flooring of BEC1, began on January 5 and pouring of concrete is scheduled to begin next week. – The installation of the exterior walls of the two modular furnaces is scheduled to begin in February. – Bus bars (electrical conductors) are being manufactured and their installation is scheduled to be completed in February. – Equipment orders are more than 95% complete, with the majority of deliveries expected for February and March; critical items related to gas treatment and handling of chlorine and graphite are expected to arrive onsite in April and May, ahead of the planned start-up of the furnaces in late June. – Detailed engineering is expected to be completed before the end of January for mechanical, piping and electrical installation in order to obtain bids and start construction in March, as planned. – The control room and office are expected to be installed in early February.
The Company will continue to update the market on its social media platforms and website as the construction continues to advance.
Nouveau Monde Completes the Purchase of the Phase 2 Site in Bécancour
In the press release dated October 27, 2020, Nouveau Monde announced that it had signed an option to purchase a 200,000-m(2) parcel of land adjacent to Olin’s property in the Bécancour industrial park. The Company announces today that it has completed the purchase of this property. As the future site of the Company’s commercial-scale transformation plant, it will produce a wide range of value-added graphite-based materials. The property presents no environmental limitations for construction and offers all necessary infrastructure to have a safe and direct chemical supply from the adjacent Olin’s property as well as rail, port, and road access for both importing raw materials and exporting final products throughout North America and Europe. The Company is currently finalizing an internal FEL-1 scoping study on its Phase 2 commercial anode material project in Bécancour; the Company will update the market once the study is completed. Nouveau Monde is planning, with its modular approach, the production of 40,000 tonnes per annum of anode material for the initial phase, with the option to expand as the anticipated demand increases in the battery and speciality markets.
Aerial view of Nouveau Monde’s planned future commercial operations in Bécancour. Learn more about the Company’s strategic location here: https://youtu.be/CGh4ZChdHmc
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/1d679f0a-96f3-4777-9b75-bb369ef31c8c
Vertical integration; from mine to high-quality graphite-based anode material production, all facilities in close proximity to one another.
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/1ca0a962-e606-4d41-9077-882c4c46aeeb
Transformer arriving at the Port of Montréal. Arrival at Bécancour scheduled this Friday, January 22, 2021.
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/ed6fc821-798f-4fdd-bf61-ea0ec1633ac0
Charles-Armand Turpin, who spent a stonking CA$1.0m on stock at an average price of CA$1.45.
Enfin nouveau monde recoive lautorisation pour la costruction
Félicitations a Nic777, s’il détenait toujours une bonne position. Comme ça fait longtemps qu’on a pas eu de nouvelles de sa part, j’espère qu’il détenait toujours une bonne part de NOU, car après qu’il nous en ait fait part il y a une couple d’années, alors que le titre était a 0.30, ça a baissé autour de 0.13. C’est sur que c’est pas facile à gérer mais je lui souhaite tout de même d’avoir pu maintenir une position appréciable.
Ce n’est pas toujours facile de garder patience … et ce nest pas toujours non plus facile a évaluer comme titre. Je ne m’attendais pas a 2.50 avant le démarage de la compagnie. Elle prévois sortir
100 000 tonnes de graphite pour 2023.
le prix de vente tourne autour de 1500/1700US/tonnes
il prévois des frais de 499us/tonne en terme de frais dexploitation. se qui donnerais environs 1000$/tonnes de profit 750M (van) apres impots
Le problème avec le graphite, c’est qu’en plus d’être une business de volume… Tu dois travailler fort pour vendre ta production contrairement à d’autres commodités. Il n’y a pas de spot market, que du gré-à-gré.
Tout est toujours rose juste avant de commencer la construction, puis les délais et les problèmes arrivent…
Très beau succès en devenir québécois, par contre la valorisation est riche pour les raisons énumérées ci-haut.
De mon côté, j’ai tout vendu début 2020 aux alentours de 0.20$ ce que j’avais acheté dans le placement à 0.30$ en 2018.
Un 24k$ vendu à 16k$ qui en vaudrait 200k$ moins d’un an plus tard, dans mon CELI.
Dire que j’aurais pu sauver le monde en m’achetant une Tesla avec les profits. J’vais continuer à brûler du gaz juste parce que j’suis amer!
Ne t’en fais pas, on en a tous des comme ça. Pour moi ça à été EXRO que j’avais acheté a 0.38 mais vendu a peu près au même prix au printemps 2020. En ce moment il est a $6… Faut rester zen. It’s part of the game.
Bien sûr, c’est inévitable. Je n’investis en bourse que depuis 6 ans et déjà j’ai XPEL acheté à 0.67$ jusqu’à 1.43$ vendu vers 5$ qui en vaut 56$+. Du Xebec à 0.75$ vendu vers 1.50$ qui en vaut 10$ et c’était tous des montants qui étaient quand même ‹ ‹ life changer › ›. Sans compter quelques autres qui ont 10x après les avoir vendus.
J’oubliais aussi les Bitcoins achetés entre 90$CAD et 600$CAD en 2013-2014 que j’ai vendu breakeven
Ça fait parti du jeu comme tu dis. Il faut le vivre pour comprendre l’importance de développer une conviction et de détenir un gagnant sur le long terme. Facile en regardant le passé mais pas évident quand on ne connait pas l’avenir!
Pour ma part jai vendu une parti de ma position et pris un bon profit il men reste encore 15 000 actions . Je me posais des questions. est ce que je conserve. suis-je devant une action qui peux valloir 5-6$ dans 2-3ans ou je suis assis sur le prochain namaska lithium. Il y a clairement encore beaucoup de chemin a faire avant la profitabilité. construction de lusine 300M (2ans) financement retard possible du projet, valeur du graphite dans quelques années …
La demande de graphite va aller en montant cest une évidence . Les etat-unis serait tres bien placé pour acheter le graphite de NOU. La chine ne pourras pas etre les seul fournisseur dans le monde …
la valeur rajouter aussi de la transformation a bécancour est a prendre en considération plus grande valeur
Jai toujours cru au projet vue le réseau electrique ici il semble avoir déposé un projet qui tiens aussi compte des impacts environnementaux et prévois plusieurs choses pour ca.
@nic777: merci de m’avoir instruit sur ce titre en 2019!
@Phil_drives: tu oublis que 750M était l’étude de la mine seulement en 2018, sans la confirmation de 25% supplémentaire de ressources en 2020 (frais d’opération et fixes les mêmes, mais profit augmentent, donc VAN majore de plus de 30%, on est rendu à 1G) ni des autres gisements sur leurs claims. Ensuite vient Becancour/matériel d’anode qui fera passer le profit à 4k/t (pour une certaine proportion du graphite de Matawanie) au lieu de 1k/t fait x20kt/année pour commencer, ensuite ramp up à 60kt/année. C’est cette omission qui fait que tu ne comprends pas les estimations de 3-5-10G (ou plus) dans 2-5-10 ans (ou moins). Le prix du graphite risque de s’envoler d’ici 5 ans, alors les profits de NOU aussi. Les américains ont les yeux sur NMGRF. Le uplisting US s’en vient. Si Tesla sort comme contrat et ajoute au hype, alors là je te dis pas (regarde HEO et PLL). Si c’est Ford, Lion, GM ou LG, quand même! NOU est backé provincial et fédéral. Pallinghurst qui contrôle NewMaska va faire une synergie. C’edt un bluechip québécois en devenir. Oui j’ai fait 2 swings, mais je dors là-dessus 5 ans.
@pbergeronbelanger: sais-tu combien de CELI millionaire il y a au Canada? Les seuls articles à ce sujet que je trouve datent de 3-4 ans. Si la tendance se maintien j’y serai sous peu. Tu es inspirant!
En effet, un Made in Canada / North America serait une bonne chose pour NOU.
Non, mais il doit y en avoir quelques-uns. Je suis récemment tomber sur une newsletter microcap dont l’auteur affirme avoir un CÉLI de 1.3-1.4M
Félicitations à toi, le plus dur c’est le premier million
Oui je parlais des chiffres de base a 750M je suis bien daccord que la transformation a bécancour pourrait apporter des clients a aller signer avec NOU. Lavenir nous le diras.